Tampilkan postingan dengan label There. Tampilkan semua postingan
Tampilkan postingan dengan label There. Tampilkan semua postingan

Senin, 10 September 2012

There is a Factory in Cikande, INDONESIA iPhone Could Produce 20 million HP in 2017

Jakarta -origin technology Manufacturer Foxconn Technology Group Taiwan are at an early stage is ready to produce handsets or smart phone end of December 2012. As many as 20 million mobile (HP) manufactured ready Indonesia.

Industry Leading technology-based Director General Ministry of industry said the Government Favor Darmadi is targeting 20 million units of mobile phones will be terproduksi in 5 years into the future.

"My target a 20 millions, 5 years into the future," says Bob when found in the Ministry of industry, journalists Jakarta, Wednesday (15/8/12).

He revealed, with the building of factories, Foxconn imports cell phone numbers can be suppressed. Each year, according to Bob, as many as 45 million mobile phone units imported from Indonesia.

The Government is targeting at least 50% of the number of such imports can be suppressed. "There are 45 million units/year, HP nearly all imports. It's US $ 5 billion more, if I could take setegahnya it's already pretty really, "he added.

Budi spoke, further types of cell phones that will be produced from high class. "We want to produce that same medium range smartphone, at US $ 50-100," pungkasnya.

As known, Foxconn Technology Group is a company manufacturing Taiwan originating in producing electronic components for some of the famous brands like Apple and Nokia.

ModernCikande Industrial Estate (MCIE) became a strong candidate location Foxconn factory development. Today's plan is the Foxconn will decide whether these locations became the location of their factories.

Foxconn will use 5,000 square meters of land for their HP assembly plant. Foxconn will buy with an area of 4000 meters factory and the production was renovated in the ModernCikande Industrial Estate.

(Jim/dnl)

Selasa, 04 September 2012

There is a Monorail, MRT and How the fate of the toll In the City Project 6?

Jakarta -the preparation of development projects Mass Rapid Transit (MRT) and the reconstruction of discourse monorail give hope-solving congestion in Jakarta. In addition to the two projects, the Government has already prepared a Jawa and the central segment of the toll in the city of 6. How luck 6 Highway segment if the monorail and the MRT is realized?

"I hear still further (the construction of Highway 6), that's what I've heard Yes, yet there is a cancellation of the hearings," said Association Chairman Indonesia toll road (ATI) Fatchur to detikFinanceRochman, Wednesday (15/8/2012).

Fatchur said although the toll segment 6 project initiatives from Pemda DKI Jakarta, but now the plans have become a national project. The Ministry of public works (PU) already approved the project and become a project of the Central Government.

"This is a national project, the toll in the city segment 6 Jakarta, this is indeed the initiative but has brought Pemda DKI to PU, already a national project," he asserted.

He spoke precisely 6 toll segment in the city will be complementary with the MRT and the monorail. According to parse enough not merely congestion Jakarta bulk transport but it takes additional motorway network as well.

"It will help each other, besides the MRT also still long. I guess in need diverse transport Jakata, "he said.

As known projects worth Rp toll segment 6 42 trillion. Jakarta Toll Development (JTD) who became the only company which qualified with the total length of highway project 69,7 km. Have submitted documents to the JTD Governing Highway (BPJT) of the Ministry of public works.

The toll Operator PT Citra Marga Nusaphala Persada Tbk (CMNP) is one of the shareholders in JTD. The rest is owned by Pemda DKI Jakarta and several STATE-OWNED Works.

Here's the plan: toll segment 6
Kemayoran-Kampung Melayu: 9.6-Kampung Melayu kmDuri Island: 11.4 kmSunter-Rawabuaya-Rock kmSunter-Ceper: 22.9 Pulo Gebang-Tambelang: 25,73 kmPasar week-Casablanca: 9.5 kmUlujami-Tanah Abang: 8,270 km

(hen/dnl)